diff --git a/context/current-state.md b/context/current-state.md index 1425912..410b02d 100644 --- a/context/current-state.md +++ b/context/current-state.md @@ -2,14 +2,21 @@ v:1 # current-state -ACTIVE: 2026-06-27. Readiness-model core engines COMMITTED (additive, not yet wired): dedup foundation core/dedup.py (c07d054) + verdict engine core/readiness.py (206bf71); 73 tests green; both code-auditor-reviewed (HIGH config-surface false-green holes found + fixed). Pi's STTIL AIOS architecture map is DONE (STTIL-Vault/Projects/STTIL-AIOS-architecture-map.md, 338 lines). Pi briefed for the readiness worklist UX (STTIL-Vault/Projects/pi-readiness-ux-design-brief-2026-06-27.md). labABLE CRUSH brief SENT 2026-06-27. PRIORITIZATION: Signal active build PAUSES at this clean checkpoint; Claude + Kisa finish the Insight Engine to its July 4 deadline (separate lane/terminal); Pi advances the Signal UX design async. - -NEXT (in order): (1) Pi: readiness worklist UX design — brief staged 2026-06-27 (STTIL-Vault/Projects/pi-readiness-ux-design-brief-2026-06-27.md): label semantics, patient→device→doc nesting, "Plan Type Needed" state, plan-type value-mapping at import. (2) Claude (after Pi design + Kisa sign-off — BEHAVIOR CHANGE to live grading): patient rollup + WIRE readiness model into the live pipeline (orchestrate in api/main.py or a new module, NOT inside coverage_calculator — circular import) + rules-to-addressable-config (citation IDs) + remove live name-guesser/default path. (3) Kisa: schedule labABLE follow-up call (CRUSH brief SENT 2026-06-27). (4) Claude: signal-convex repo + Convex spike Phase 1. (5) Claude: research-versioning Layer-1 + add signal/docs/ to scope. NOTE: Signal active build PAUSED until the Insight Engine ships (~July 4 deadline). +ACTIVE: 2026-06-28. Signal paused at clean checkpoint — Insight Engine in active BUILD phase for July 4 deadline. See insight-engine/context/current-state.md and insight-engine/handoff-clock.md for full state. Key progress today: x-sight guided experience designed (Compass) and approved by Kisa, lane-lock handoff clock created, frontend finish readiness assessed (15 ranked items). Claude is building the Compass landing + B1 deploy blocker + finish items. Signal READINESS MODEL still queued at the clean checkpoint from 2026-06-27. [AIOS build status] The map is written. Highest-impact build is the readiness model, NOT AIOS enhancements. AIOS Phase 1 items (reasoning frameworks, Playground, /board skill) are <5 hours total and optional until Signal has customer momentum. - 2026-06-27 [Pi]: Insight Engine adaptivity review cycle COMPLETE — 3 audit docs written (pi-build-review-2026-06-27.md: 7 findings, 3 HIGH/2 MEDIUM/2 LOW; claude-pushback-to-pi-2026-06-27.md: 3 challenges; pi-pushback-response-2026-06-27.md: all 3 conceded with code evidence). Claude implements 5 fixes next. Truncation root cause found: deepseek/deepseek-v4-flash was missing from models.json with no explicit maxTokens, compounded by thinking:high. Added with maxTokens=65536. +## Cross-Project Bridge + +Insight Engine (July 4 deadline) is the active project. Key files: + +- State: `/Users/sttil-solutions/projects/insight-engine/context/current-state.md` +- Handoff clock: `/Users/sttil-solutions/projects/insight-engine/handoff-clock.md` (phase/owner/gate per item) +- Active item: x-sight guided experience landing — BUILD phase, owned by Claude +- Clock shows which items are blocked, waiting, or in progress + ## Decisions (last - 2026-06-27 [CC]: Readiness engines COMMITTED — c07d054 (dedup foundation) + 206bf71 (verdict engine); code-auditor found + fixed HIGH config-surface false-green holes (a known plan missing from payer_rules.json no longer grades green; the green gate now checks every item); 73 tests green. Pi readiness-UX brief staged. labABLE CRUSH brief SENT. PRIORITIZATION DECISION (Kisa): Signal active build pauses at this checkpoint; Claude + Kisa finish the Insight Engine to its July 4 deadline (separate lane); Pi advances the Signal UX design async. Lanes-clear: one project per terminal/session. @@ -48,4 +55,4 @@ NEXT (in order): (1) Pi: readiness worklist UX design — brief staged 2026-06-2 State protocol: read = `git pull --rebase` then read this file (warn if Updated > 24h old); write = edit ACTIVE/NEXT, append one author-stamped decision, then commit + push. Full protocol in the `state-sync` skill. Detailed ship-status (what shipped / didn't / why) = docs/ship-status-ledger.md. TriLane = searchable archive, not live state. -## Updated: 2026-06-27 (Pi: Insight Engine adaptivity review cycle done — 3 docs written, 7 findings identified, 3 challenges conceded. deepseek/deepseek-v4-flash model config added to models.json with explicit maxTokens=65536 to fix output truncation. See next-item update.) +## Updated: 2026-06-28 (Pi: Insigh Engine progress bridge added — x-sight designed/approved, handoff clock created, frontend readiness assessed. Signal paused at clean 2026-06-27 checkpoint.)