diff --git a/context/current-state.md b/context/current-state.md index 734638d..45f7393 100644 --- a/context/current-state.md +++ b/context/current-state.md @@ -4,7 +4,7 @@ v:1 ACTIVE: 2026-07-07 [CC]. READINESS-MODEL BACKEND COMPLETE: P1-P5 all SHIPPED + LIVE-VERIFIED (a3af499, d24340c, bd92126, a53728e, f28b5bf; Railway + Vercel deployed; doc_status migration applied to prod). 169 tests + Pi E2E 33/33 green. P6 (frontend nesting) is the ONLY remaining item — BLOCKED on Kisa approving docs/mockups/p6-worklist-mockup-2026-07-07.png (decisions A-D). -NEXT: (Kisa) rule on P6 mockup v2 (docs/mockups/p6-worklist-mockup-v2-2026-07-07.png): Decision B-v2 (generalized purple data-gap family) + Decision E (data-gap patients stay Action Needed with a Data-gaps filter vs a new label; CC recommends the filter) -> then CC builds the frontend. A (nesting) + D (per-line export) LOCKED 2026-07-07; (Kisa) confirm OQ1 plan_type-ingestion decision recorded 2026-07-07 (shipped per umbrella plan; two-line revert if reversed); (Kisa) attorney bundle READY TO SEND (signal/pitch/legal/attorney-bundle-2026-07-07, 5 Word docs + sendable memo): confirm recipient (Clyde Mathes vs Bittinger/Nixon), entity name + formation state, arbitration-vs-courts posture, Partner Concepts carve-out keep/drop, then email; Gaboro re-approach per reactivation plan 00 (unchanged). Queued behind Signal: UMSIS docs-only activation, "63% written off" Draft fix. +NEXT: (Kisa) signed-in click-through of the new worklist (upload a test-data CSV; probe: two-device override isolation, PTN CTA, Clear-to-Ship tab empty without plan_type, confirm-visit fan-out, per-line export opens in Excel); (Kisa) confirm OQ1 + the retained-legacy-stopgap deviation (both logged); (Kisa) attorney bundle send + Gaboro re-approach (her lanes); (CC next session) update pilot guide screenshots + demo narrative for the plan-type mapping step (flag to lead-content), CSV formula-injection sanitization backlog item. Queued behind Signal: UMSIS docs-only activation, '63% written off' Draft fix. PRIOR ACTIVE: 2026-06-28. Signal paused at clean checkpoint — Insight Engine in active BUILD phase for July 4 deadline. See insight-engine/context/current-state.md and insight-engine/handoff-clock.md for full state. Key progress today: x-sight guided experience designed (Compass) and approved by Kisa, lane-lock handoff clock created, frontend finish readiness assessed (15 ranked items). Claude is building the Compass landing + B1 deploy blocker + finish items. Signal READINESS MODEL still queued at the clean checkpoint from 2026-06-27. @@ -25,6 +25,8 @@ Insight Engine (July 4 deadline = tomorrow) is the active project. Key files: ## Decisions (last +- 2026-07-07 [Kisa/CC]: P6 SHIPPED (6181de7) — all five design decisions approved and built (patient nesting, purple data-gap family, extended legend, per-line export, honest-label data-gap filter). Readiness-model build P1-P6 COMPLETE in one day: 6 ship commits, every item independently audited before ship, adversarial review killed a false-green pre-ship, live-measured verification at each step. Known deviations logged: legacy DOCS_REQUIRED stopgap retained on the ?legacy=1 surface; OQ1 shipped per umbrella plan. + - 2026-07-07 [Kisa/CC]: P6 rulings round 1 — nesting layout APPROVED and per-line export APPROVED (both in KG). Failed-data principle set by Kisa: Signal never acts on rows whose required info was not mapped or provided, and never hides them — engine-dropped rows now surface in skipped_reasons (shipped + deployed same day). Plan Type Needed stays its own state (it selects the rules; not a chaseable document); all other file-level gaps get the purple family treatment pending Decision B-v2/E. - 2026-07-07 [CC]: Readiness-model backend COMPLETE (P2-P5 shipped same day as P1): citation IDs live (R-registry), patient rollup + nested payload live, device-scoped overrides live (doc_status migration applied to prod; overrides now feed the verdict; the leak is dead, live-measured), plan-type enforcement live (zero greens without a mapped plan type, live-measured; Phase 2c deletion stays Kisa-gated). Every item independently audited SHIP before ship. P6 mockup rendered for Kisa (4 decisions annotated). @@ -63,4 +65,4 @@ Insight Engine (July 4 deadline = tomorrow) is the active project. Key files: State protocol: read = `git pull --rebase` then read this file (warn if Updated > 24h old); write = edit ACTIVE/NEXT, append one author-stamped decision, then commit + push. Full protocol in the `state-sync` skill. Detailed ship-status (what shipped / didn't / why) = docs/ship-status-ledger.md. TriLane = searchable archive, not live state. -## Updated: 2026-07-07 (CC: readiness-model backend P1-P5 complete, live-verified, deployed; P6 gated on Kisa mockup approval.) +## Updated: 2026-07-07 (CC: Signal readiness-model build COMPLETE P1-P6, deployed, live-verified; Kisa click-through + her attorney/Gaboro lanes are the open items.) diff --git a/docs/ship-status-ledger.md b/docs/ship-status-ledger.md index e41cda9..71152d0 100644 --- a/docs/ship-status-ledger.md +++ b/docs/ship-status-ledger.md @@ -112,3 +112,18 @@ code-auditor SHIP verdict and measured live verification: Final state: 169 unit/API tests green, Pi E2E 33/33, live drives recorded above. P6 (frontend nesting) BLOCKED on Kisa's mockup approval: docs/mockups/p6-worklist-mockup-2026-07-07.png (decisions A-D annotated). + +## Shipped: P6 patient-nested worklist (2026-07-07, Claude, commit 6181de7) + +The readiness-model build is COMPLETE end to end. The worklist now renders +one row per patient (rollup verdict), expanding into device lines with doc +checklists and rule citations; green is earned only from the verdict. All +five Kisa decisions honored (nesting, purple family, legend, per-line export, +no-sixth-label data-gap filter). Not-processed strip + download; PTN CTA; +device-scoped cycling returns the re-rolled patient via the P4 echo; Confirm +Visit fans out. Legacy table at ?legacy=1 (stopgap intentionally retained +there). Backend: /api/export lines[] (live-verified). Audit: SHIP; MEDIUM +line-identity merge fix + 2 LOWs applied pre-ship. New bundle confirmed +serving (marker strings measured). REMAINING: Kisa's signed-in click-through +(6 probes listed in the audit); backlog: CSV formula-injection sanitization +pass (pre-existing, both export paths).