diff --git a/context/current-state.md b/context/current-state.md index a6a43ba..734638d 100644 --- a/context/current-state.md +++ b/context/current-state.md @@ -4,7 +4,7 @@ v:1 ACTIVE: 2026-07-07 [CC]. READINESS-MODEL BACKEND COMPLETE: P1-P5 all SHIPPED + LIVE-VERIFIED (a3af499, d24340c, bd92126, a53728e, f28b5bf; Railway + Vercel deployed; doc_status migration applied to prod). 169 tests + Pi E2E 33/33 green. P6 (frontend nesting) is the ONLY remaining item — BLOCKED on Kisa approving docs/mockups/p6-worklist-mockup-2026-07-07.png (decisions A-D). -NEXT: (Kisa) approve/adjust P6 mockup decisions A-D (docs/mockups/p6-worklist-mockup-2026-07-07.png) -> then CC builds the frontend nesting; (Kisa) confirm OQ1 plan_type-ingestion decision recorded 2026-07-07 (shipped per umbrella plan; two-line revert if reversed); (Kisa) attorney bundle READY TO SEND (signal/pitch/legal/attorney-bundle-2026-07-07, 5 Word docs + sendable memo): confirm recipient (Clyde Mathes vs Bittinger/Nixon), entity name + formation state, arbitration-vs-courts posture, Partner Concepts carve-out keep/drop, then email; Gaboro re-approach per reactivation plan 00 (unchanged). Queued behind Signal: UMSIS docs-only activation, "63% written off" Draft fix. +NEXT: (Kisa) rule on P6 mockup v2 (docs/mockups/p6-worklist-mockup-v2-2026-07-07.png): Decision B-v2 (generalized purple data-gap family) + Decision E (data-gap patients stay Action Needed with a Data-gaps filter vs a new label; CC recommends the filter) -> then CC builds the frontend. A (nesting) + D (per-line export) LOCKED 2026-07-07; (Kisa) confirm OQ1 plan_type-ingestion decision recorded 2026-07-07 (shipped per umbrella plan; two-line revert if reversed); (Kisa) attorney bundle READY TO SEND (signal/pitch/legal/attorney-bundle-2026-07-07, 5 Word docs + sendable memo): confirm recipient (Clyde Mathes vs Bittinger/Nixon), entity name + formation state, arbitration-vs-courts posture, Partner Concepts carve-out keep/drop, then email; Gaboro re-approach per reactivation plan 00 (unchanged). Queued behind Signal: UMSIS docs-only activation, "63% written off" Draft fix. PRIOR ACTIVE: 2026-06-28. Signal paused at clean checkpoint — Insight Engine in active BUILD phase for July 4 deadline. See insight-engine/context/current-state.md and insight-engine/handoff-clock.md for full state. Key progress today: x-sight guided experience designed (Compass) and approved by Kisa, lane-lock handoff clock created, frontend finish readiness assessed (15 ranked items). Claude is building the Compass landing + B1 deploy blocker + finish items. Signal READINESS MODEL still queued at the clean checkpoint from 2026-06-27. @@ -25,6 +25,8 @@ Insight Engine (July 4 deadline = tomorrow) is the active project. Key files: ## Decisions (last +- 2026-07-07 [Kisa/CC]: P6 rulings round 1 — nesting layout APPROVED and per-line export APPROVED (both in KG). Failed-data principle set by Kisa: Signal never acts on rows whose required info was not mapped or provided, and never hides them — engine-dropped rows now surface in skipped_reasons (shipped + deployed same day). Plan Type Needed stays its own state (it selects the rules; not a chaseable document); all other file-level gaps get the purple family treatment pending Decision B-v2/E. + - 2026-07-07 [CC]: Readiness-model backend COMPLETE (P2-P5 shipped same day as P1): citation IDs live (R-registry), patient rollup + nested payload live, device-scoped overrides live (doc_status migration applied to prod; overrides now feed the verdict; the leak is dead, live-measured), plan-type enforcement live (zero greens without a mapped plan type, live-measured; Phase 2c deletion stays Kisa-gated). Every item independently audited SHIP before ship. P6 mockup rendered for Kisa (4 decisions annotated). - 2026-07-07 [CC]: Attorney-review legal bundle PREPARED (lead-sttil drafted, ops-steward independently reviewed, 6 findings fixed incl. 4 HIGH counterparty-name leaks). LOI template v3 (product-agnostic body, Exhibit A pre-filled for Signal, labABLE negotiation learnings folded in), NDA template v3 (products list corrected to Signal/Vitality Med Tracker/UMSIS + catch-all), BAA template v1 (generalized from Gaboro draft, forward-looking posture block), cover memo bundling both templates + BAA + FDA CDS memo + labABLE AKS question per reactivation plan 00. Entity name corrected everywhere to KJF Professional Services LLC dba STTIL Solutions (per executed labABLE LOI; kg_add recorded); formation state left as placeholder (old docs disagree: Delaware/Florida/Pennsylvania) = attorney Q1. Templates: STTIL-Vault/Projects/Legal/ (LOI+NDA v3) + signal/pitch/legal/ (BAA, memo). Send-ready docx: signal/pitch/legal/attorney-bundle-2026-07-07/. diff --git a/docs/mockups/p6-worklist-mockup-v2-2026-07-07.png b/docs/mockups/p6-worklist-mockup-v2-2026-07-07.png new file mode 100644 index 0000000..54ffded Binary files /dev/null and b/docs/mockups/p6-worklist-mockup-v2-2026-07-07.png differ