diff --git a/context/current-state.md b/context/current-state.md index 6020c37..0f6003d 100644 --- a/context/current-state.md +++ b/context/current-state.md @@ -2,7 +2,7 @@ v:1 # current-state -ACTIVE: 2026-07-07 [CC]. READINESS-MODEL BACKEND COMPLETE: P1-P5 all SHIPPED + LIVE-VERIFIED (a3af499, d24340c, bd92126, a53728e, f28b5bf; Railway + Vercel deployed; doc_status migration applied to prod). 169 tests + Pi E2E 33/33 green. P6 (frontend nesting) is the ONLY remaining item — BLOCKED on Kisa approving docs/mockups/p6-worklist-mockup-2026-07-07.png (decisions A-D). +ACTIVE: 2026-07-07 [CC]. SIGNAL READINESS-MODEL BUILD COMPLETE P1-P6 (final commit 6181de7): backend + patient-nested worklist shipped, six independent audits, deployed to Railway + Vercel, live-verified where measurable (171 tests, Pi E2E 33/33, new bundle confirmed serving). All mockup decisions approved incl. the generalized data-gap family. REMAINING: Kisa signed-in click-through (5 probes in ledger). NEXT: (Kisa) signed-in click-through of the new worklist (upload a test-data CSV; probe: two-device override isolation, PTN CTA, Clear-to-Ship tab empty without plan_type, confirm-visit fan-out, per-line export opens in Excel); (Kisa) confirm OQ1 + the retained-legacy-stopgap deviation (both logged); (Kisa) attorney bundle SEND to Clyde Mathes, regenerated 2026-07-07 with her rulings (Florida, arbitration in LOI S14 + NDA 10.2, Arkisia Fenn signature, verified against the executed labABLE PDF; LOI 8.4 Partner Concepts carve-out keep/drop still open to discuss) + Gaboro re-approach (her lanes); (CC next session) update pilot guide screenshots + demo narrative for the plan-type mapping step (flag to lead-content), CSV formula-injection sanitization backlog item. Queued behind Signal: UMSIS docs-only activation, '63% written off' Draft fix.