diff --git a/context/current-state.md b/context/current-state.md index 45f7393..6020c37 100644 --- a/context/current-state.md +++ b/context/current-state.md @@ -4,7 +4,7 @@ v:1 ACTIVE: 2026-07-07 [CC]. READINESS-MODEL BACKEND COMPLETE: P1-P5 all SHIPPED + LIVE-VERIFIED (a3af499, d24340c, bd92126, a53728e, f28b5bf; Railway + Vercel deployed; doc_status migration applied to prod). 169 tests + Pi E2E 33/33 green. P6 (frontend nesting) is the ONLY remaining item — BLOCKED on Kisa approving docs/mockups/p6-worklist-mockup-2026-07-07.png (decisions A-D). -NEXT: (Kisa) signed-in click-through of the new worklist (upload a test-data CSV; probe: two-device override isolation, PTN CTA, Clear-to-Ship tab empty without plan_type, confirm-visit fan-out, per-line export opens in Excel); (Kisa) confirm OQ1 + the retained-legacy-stopgap deviation (both logged); (Kisa) attorney bundle send + Gaboro re-approach (her lanes); (CC next session) update pilot guide screenshots + demo narrative for the plan-type mapping step (flag to lead-content), CSV formula-injection sanitization backlog item. Queued behind Signal: UMSIS docs-only activation, '63% written off' Draft fix. +NEXT: (Kisa) signed-in click-through of the new worklist (upload a test-data CSV; probe: two-device override isolation, PTN CTA, Clear-to-Ship tab empty without plan_type, confirm-visit fan-out, per-line export opens in Excel); (Kisa) confirm OQ1 + the retained-legacy-stopgap deviation (both logged); (Kisa) attorney bundle SEND to Clyde Mathes, regenerated 2026-07-07 with her rulings (Florida, arbitration in LOI S14 + NDA 10.2, Arkisia Fenn signature, verified against the executed labABLE PDF; LOI 8.4 Partner Concepts carve-out keep/drop still open to discuss) + Gaboro re-approach (her lanes); (CC next session) update pilot guide screenshots + demo narrative for the plan-type mapping step (flag to lead-content), CSV formula-injection sanitization backlog item. Queued behind Signal: UMSIS docs-only activation, '63% written off' Draft fix. PRIOR ACTIVE: 2026-06-28. Signal paused at clean checkpoint — Insight Engine in active BUILD phase for July 4 deadline. See insight-engine/context/current-state.md and insight-engine/handoff-clock.md for full state. Key progress today: x-sight guided experience designed (Compass) and approved by Kisa, lane-lock handoff clock created, frontend finish readiness assessed (15 ranked items). Claude is building the Compass landing + B1 deploy blocker + finish items. Signal READINESS MODEL still queued at the clean checkpoint from 2026-06-27. @@ -25,6 +25,8 @@ Insight Engine (July 4 deadline = tomorrow) is the active project. Key files: ## Decisions (last +- 2026-07-07 [Kisa/CC]: Legal bundle rulings applied. Recipient = Clyde Mathes; entity = KJF Professional Services LLC dba STTIL Solutions, Florida LLC, CONFIRMED; arbitration = default dispute posture (NDA 10.2 rewritten to mirror LOI S14). Final-signed-text-rules principle applied: bundle verified against the executed labABLE PDF (signed Daniel Rojas + Arkisia Fenn 6/12/2026; binding sections 3-11; kit-in-kit ABSENT from executed text, discussed concept only; Delaware law on their paper). Signature blocks now Arkisia (Kisa) Fenn. All rulings in KG (legal_entity superseded, dispute_resolution_default, attorney_of_record, Kisa legal_name). Open: LOI 8.4 carve-out keep/drop. Also FIXED same session: TriLane search 500s were a dead OpenRouter key in trilane/backend/.env (embedding AND llm keys), swapped to the working ~/.config/openrouter key, kickstarted, verified live end to end (.env.bak-2026-07-07 backup; key now shared with ask.py, mint a dedicated key later if preferred). + - 2026-07-07 [Kisa/CC]: P6 SHIPPED (6181de7) — all five design decisions approved and built (patient nesting, purple data-gap family, extended legend, per-line export, honest-label data-gap filter). Readiness-model build P1-P6 COMPLETE in one day: 6 ship commits, every item independently audited before ship, adversarial review killed a false-green pre-ship, live-measured verification at each step. Known deviations logged: legacy DOCS_REQUIRED stopgap retained on the ?legacy=1 surface; OQ1 shipped per umbrella plan. - 2026-07-07 [Kisa/CC]: P6 rulings round 1 — nesting layout APPROVED and per-line export APPROVED (both in KG). Failed-data principle set by Kisa: Signal never acts on rows whose required info was not mapped or provided, and never hides them — engine-dropped rows now surface in skipped_reasons (shipped + deployed same day). Plan Type Needed stays its own state (it selects the rules; not a chaseable document); all other file-level gaps get the purple family treatment pending Decision B-v2/E. diff --git a/pitch/legal/attorney-bundle-2026-07-07/00-cover-memo-SENDABLE.docx b/pitch/legal/attorney-bundle-2026-07-07/00-cover-memo-SENDABLE.docx index 757cd8e..6a5d8e0 100644 Binary files a/pitch/legal/attorney-bundle-2026-07-07/00-cover-memo-SENDABLE.docx and b/pitch/legal/attorney-bundle-2026-07-07/00-cover-memo-SENDABLE.docx differ diff --git a/pitch/legal/attorney-bundle-2026-07-07/01-STTIL-pilot-LOI-template-v3.docx b/pitch/legal/attorney-bundle-2026-07-07/01-STTIL-pilot-LOI-template-v3.docx index 4e290de..2fac833 100644 Binary files a/pitch/legal/attorney-bundle-2026-07-07/01-STTIL-pilot-LOI-template-v3.docx and b/pitch/legal/attorney-bundle-2026-07-07/01-STTIL-pilot-LOI-template-v3.docx differ diff --git a/pitch/legal/attorney-bundle-2026-07-07/02-STTIL-mutual-NDA-template-v3.docx b/pitch/legal/attorney-bundle-2026-07-07/02-STTIL-mutual-NDA-template-v3.docx index 3707483..7163064 100644 Binary files a/pitch/legal/attorney-bundle-2026-07-07/02-STTIL-mutual-NDA-template-v3.docx and b/pitch/legal/attorney-bundle-2026-07-07/02-STTIL-mutual-NDA-template-v3.docx differ diff --git a/pitch/legal/attorney-bundle-2026-07-07/03-STTIL-BAA-template-v1.docx b/pitch/legal/attorney-bundle-2026-07-07/03-STTIL-BAA-template-v1.docx index 411d0c0..9f078af 100644 Binary files a/pitch/legal/attorney-bundle-2026-07-07/03-STTIL-BAA-template-v1.docx and b/pitch/legal/attorney-bundle-2026-07-07/03-STTIL-BAA-template-v1.docx differ