[CC] nuggets: legal bundle ready-to-send detail, TriLane fix noted, stale readiness thread pruned

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
Kisa 2026-07-07 20:16:50 -04:00
parent 33381d6847
commit 80c8dc7186

View file

@ -4,7 +4,7 @@ v:1
ACTIVE: 2026-07-07 [CC]. SIGNAL READINESS-MODEL BUILD COMPLETE P1-P6 (final commit 6181de7): backend + patient-nested worklist shipped, six independent audits, deployed to Railway + Vercel, live-verified where measurable (171 tests, Pi E2E 33/33, new bundle confirmed serving). All mockup decisions approved incl. the generalized data-gap family. REMAINING: Kisa signed-in click-through (5 probes in ledger).
NEXT: (Kisa+CC) FIRST: debug the Clerk sign-in issue — Kisa reported she cannot get into the app (details incoming; observed: prod sign-in page renders email-only form, no Google button visible on the Clerk card). It gates the click-through. THEN: (Kisa) 5-probe click-through of the new worklist; (Kisa) confirm OQ1 + legacy-stopgap deviation; (Kisa) attorney bundle send + Gaboro re-approach; (CC) pilot-guide screenshots + demo narrative plan-type step; (CC) CSV formula-injection sanitization backlog.
NEXT: (Kisa+CC) FIRST: debug the Clerk sign-in issue — Kisa reported she cannot get into the app (details incoming; observed: prod sign-in page renders email-only form, no Google button visible on the Clerk card). It gates the click-through. THEN: (Kisa) 5-probe click-through of the new worklist; (Kisa) confirm OQ1 + legacy-stopgap deviation; (Kisa) attorney bundle SEND to Clyde Mathes (attorney-bundle-2026-07-07, rulings applied; LOI 8.4 carve-out open to discuss) + Gaboro re-approach; (CC) pilot-guide screenshots + demo narrative plan-type step; (CC) CSV formula-injection sanitization backlog.
PRIOR ACTIVE: 2026-06-28. Signal paused at clean checkpoint — Insight Engine in active BUILD phase for July 4 deadline. See insight-engine/context/current-state.md and insight-engine/handoff-clock.md for full state. Key progress today: x-sight guided experience designed (Compass) and approved by Kisa, lane-lock handoff clock created, frontend finish readiness assessed (15 ranked items). Claude is building the Compass landing + B1 deploy blocker + finish items. Signal READINESS MODEL still queued at the clean checkpoint from 2026-06-27.
@ -50,7 +50,7 @@ Insight Engine (July 4 deadline = tomorrow) is the active project. Key files:
- CLERK LOGIN (2026-07-07): Kisa cannot sign in to signal-ui-xi.vercel.app. Observed by CC: the Clerk card shows an email-address-only form (no Google OAuth button) though Google OAuth is configured per stack notes. Gates the P6 click-through. Debug in progress.
- CONVEX-SIGNAL SPIKE (2026-06-24): design ready (docs/convex-signal-spike-design-2026-06-24.md); separate repo signal-convex; Pi designed. Deps: Kisa's Convex BAA email; repo creation post-approval. Goal: prove Convex on the real product before any platform commitment.
- DATA-PLATFORM DECISION (2026-06-24): NocoDB leads broke (no-PK, corrupted source). Options: repaired-NocoDB / Supabase / Neon / AWS / Convex. Leads = non-PHI. Informed by the Convex spike. Interim: capture works; 2 test rows un-deletable.
- READINESS MODEL BUILD (top Signal priority): UNBLOCKED, core engines shipped (dedup + verdict, 57 tests; dedup key locked in docs/dedup-design-2026-06-24.md). Remaining: rules-to-config citation IDs, patient rollup, device override, plan-type enforcement, frontend nesting (Pi's next UX task alongside "plan type needed"). Not yet wired into the live pipeline — additive-only.
- LEGAL BUNDLE (2026-07-07): READY TO SEND to Clyde Mathes (signal/pitch/legal/attorney-bundle-2026-07-07, 5 docx + sendable memo; rulings applied: Florida, arbitration, Arkisia Fenn signature; verified against the executed labABLE PDF). Open: LOI 8.4 Partner Concepts carve-out keep/drop, memo already asks counsel about its enforceability. Attorney reply gates the FDA memo ruling, AKS guidance, and any LOI/NDA execution with a pilot partner. (Stale READINESS MODEL thread pruned: P1-P6 complete per ACTIVE.)
- labABLE: CRUSH brief SENT 2026-06-27. Watch for their reply; schedule the follow-up call (Mehul open to the proactive auditor-style play). Internal-only prep at Projects/labABLE-next-call-prep-INTERNAL-2026-06-25.md.
## Stack
@ -68,4 +68,4 @@ Insight Engine (July 4 deadline = tomorrow) is the active project. Key files:
State protocol: read = `git pull --rebase` then read this file (warn if Updated > 24h old); write = edit ACTIVE/NEXT, append one author-stamped decision, then commit + push. Full protocol in the `state-sync` skill. Detailed ship-status (what shipped / didn't / why) = docs/ship-status-ledger.md. TriLane = searchable archive, not live state.
## Updated: 2026-07-07 (CC: nuggets checkpoint — build complete P1-P6 pushed everywhere; NEW blocker logged: Clerk sign-in issue gates the click-through.)
## Updated: 2026-07-07 (CC: nuggets checkpoint x2 — legal bundle rulings applied, verified vs executed PDF, ready to send to Clyde Mathes; TriLane search fixed (dead OpenRouter keys swapped); stale readiness Open Thread pruned. Earlier same day: build complete P1-P6; Clerk sign-in blocker gates the click-through.)