Commit graph

3 commits

Author SHA1 Message Date
Kisa
ca65185ba2 feat(signal-ui): Clerk redirect fix, stoplight colors, Clear to Ship checkmark, tab counts
- ClerkProvider now sets signInUrl/afterSignInUrl to signal-ui-xi.vercel.app so
  invitation emails and sign-in links land on the webapp not Clerk's hosted page
- Stoplight colors on status badges (red/amber/teal/green)
- Clear to Ship shows checkmark instead of dot
- Filter tabs include count + percentage
- EmptyState V2: "Drop your file here" heading
- Legend bar removed from worklist header (redundant with tabs)
- Pilot readiness at 13/13 (100%) as of 2026-06-16
- Signal Intelligence spec added to docs

Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-06-16 15:01:39 -04:00
Kisa
ec2cd24bd7 Add Phase 3: Clerk auth with org-scoped data isolation
Backend: JWT middleware validates Clerk tokens on every request,
extracts org ID from claims, enforces org-scoped queries via
Supabase RLS. Frontend: ClerkProvider wraps the app, auth gate
blocks unauthenticated access, UserButton in header, token
injected into every API call. Supabase production wired to trust
Clerk JWTs via Third-Party Auth integration.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-05-29 12:12:17 -04:00
Kisa
a424ac9d13 feat: add reason strings per patient, fix export headers, add signal-ui source
- Add _build_reason() to backend — per-patient reason strings with specific
  day counts (e.g. "Supply lapsed 70 days ago. Prescriber contact required.")
- Add reason field to RecordOut model and backend /api/export CSV
- Fix export column headers: Coverage End Date → Resupply End Date,
  Days Until Coverage End → Days Until Resupply End
- Pass reason through apiRecordToLocal in frontend api.js
- Display reason as muted sub-line under status badge in WorklistTable
- Add reason column to client-side CSVExport
- Add signal-ui React source to repo (was untracked)
- CLAUDE.md: add Billing and CMS integrations to Phase 2 deferred table
- research: restore Section 14 stat verification (May 23 recovery)

Deployed to Railway production — health check confirmed live.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-05-26 09:45:02 -04:00